The water at
The Slammer,
was coming out of a well laden with minerals. We added this small structure
to house all of the equipment. It was meant to have a small reflecting pool
(filled with the backwash from the filter system every couple days), but
we started work on other projects which might interfere with the placement
of the pool. A plaster bust of the client hung in the small window and at
night was lit up from below.
This was our first residential project to face demolition. It was removed to
make way for
Cellblock B.